Improving Innovation and Productivity In Earthworks
A new report Improving Innovation and Productivity In Earthworks from the Infrastructure Industry Innovation Partnership (i3P) has identified areas for efficiency improvements in the earthworks sector. These represent a potential 10-20% reduction in the UK’s annual spend on earthworks, which is currently between £1bn-£1.5bn.
Productivity in the UK’s construction sector has barely improved in the last 20 years. In 2020, i3P set up a Tiger Team to research the sector; the team has highlighted 24 opportunities which, if implemented, have the potential to save the industry £100m–£300m per annum. The recommendations could also see embodied carbon reduction and improved air quality.
A total of 28 organisations were involved in the research including the creators of some of Britain’s largest infrastructure projects – HS2, the Environment Agency, National Highways, EDF, Sellafield, Thames Tideway and the Northern Ireland Department of Infrastructure.
Among the opportunities identified to transform earthworks are proposals to:
- Expedite the use and development of Connected and Autonomous Plant (CAP) which has the potential to significantly increase the productivity, accuracy and safety of earthworks.
- Use state-of-the-art geotechnical testing technologies and real time performance indicators to improve earthworks placement quality and reduce programme delays.
- Adopt digital technology to improve communication, accuracy, control and predictability of earthworks processes.
- Encourage the use of alternative plant fuel types (e.g. electrified, hydrogen and hybrid technologies), which have the potential to reduce CO2 emissions, improve air quality and extend operational working hours.
Through its community and network, i3P will continue to champion the changes required.
You can access the report here.
[edit] Related articles on Designing Buildings
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.